Total leads
0
AI-scored, 60-mi radius
Hot leads
0
ICP score ≥ 72
Pipeline value
$0
open proposals
kW designed
0
across all proposals
Jobs won
0
incl. Tewksbury DC
⏰ Deal radar — needs a nudgeCloser agent
10 overdueView all →
| Merrimack Valley Foods Distribution Follow up — book the site survey before the window closes. | Contacted 16d ago, no reply | Overdue |
| Pheasant Lane Mall Reach out — introduce and qualify the building. | No outreach yet · 16d in pipeline | Overdue |
| Drum Hill Shopping Center Chase the signature — follow up on the proposal. | Marked proposed 12d ago, unsigned | Overdue |
| Greater Lowell Components Reach out — introduce and qualify the building. | No outreach yet · 16d in pipeline | Overdue |
| Stony Brook Reclamation Parcel Reach out — introduce and qualify the building. | No outreach yet · 16d in pipeline | Overdue |
🔥 Hot leadsView all →
| Tewksbury Logistics Center Tewksbury, MA · Warehouse / Distribution | 98 | Won |
| Merrimack Valley Foods Distribution Lowell, MA · Cold Storage / Refrigerated | 97 | Contacted |
| Pheasant Lane Mall Nashua, NH · Shopping Center | 95 | New |
| Drum Hill Shopping Center Chelmsford, MA · Shopping Center | 93 | Proposed |
| Greater Lowell Components Lowell, MA · Manufacturing / Industrial | 91 | New |
| Stony Brook Reclamation Parcel Westford, MA · Open Land (Ground-Mount) | 85 | New |
Recent activity
⏰
Deal-clock: Contacted 15d ago, no reply. Follow up — book the site survey before the window closes.
Residence — 14 Tadmuck Rd · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Town of Westford DPW Facility · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Princeton Westford Apartments · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Nashoba Valley Technical High School · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Cross Point Towers · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Stony Brook Reclamation Parcel · 10h ago
⏰
Deal-clock: No outreach yet · 15d in pipeline. Reach out — introduce and qualify the building.
Greater Lowell Components · 10h ago
⏰
Deal-clock: Marked proposed 11d ago, unsigned. Chase the signature — follow up on the proposal.
Drum Hill Shopping Center · 10h ago